Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Sugaya, Naoto; Okada, Yuji; Nishimura, Arashi; Sonobe, Hiroshi; Kimura, Nobuaki; Kimura, Akihiro; Hanawa, Yoshio; Nemoto, Hiroyoshi
JAEA-Testing 2020-004, 67 Pages, 2020/08
In the Japan Materials Testing Reactor (JMTR), the leakage accidents of radioactive waste liquid were occurred from the tanks and pipes of the liquid waste disposal facility in the JMTR tank-yard building in JFY2014. In order to respond to the accident, the tanks and pipes were replaced from JFY2016 to 2019. On the other hand, a lot of cracks were occurred on the concreate wall of the tank-yard building when the frame structure supports were fixed to the concrete wall in the replacement work. Thus, it is necessary to repair the concreate wall of the tank-yard building. Especially, some cracks with swelling (cone-shaped fracture) were raised around some anchor bolts (the post-installed chemical anchor bolts) fixed the frame structure supports. The repairing method for the cone-shaped fracture of the concrete wall is standardized, but there was no reference value of tensile strength for the validation of the post-installed chemical anchor bolts after the repairing method. In this report, the repairing method was selected for the cone-shaped fracture on the concreate wall and the reference value of tensile strength for the validation of the post-installed chemical anchor bolts by this repairing method. The mock-ups for repairing cone-shaped fracture were fabricated by the selected repairing method and the tensile tests of the post-installed chemical anchor bolts were performed. From the results, the validation of the repairing method was obtained in this test and it was obvious the repairing of cone-shaped fracture is preferable method for the concreate wall of the JMTR tank-yard building.